Cracking Sub-Base
A base poured over uncompacted Houston clay shifts with moisture, opening surface cracks within a season or two.
Compacted Subgrade First
Site prep includes grading, compaction, and drainage slope before any base layer is poured, so the slab has stable ground to sit on.